All articles
August 16, 2026 ~ 8 min read

How to lay a floating laminate floor

A complete guide to laying a floating floor yourself: subfloor prep, underlay, layout planning, expansion gaps, tricky cuts and finishing. Every step, plus the mistakes to avoid.

How to lay a floating laminate floor

Laying a floating floor is one of the few renovation jobs that is genuinely beginner-friendly: no glue, no nails, just boards that click together. Two people can do a 12 m² room in a day. But the difference between a flawless floor and one that creaks, lifts or gaps between the boards is decided almost entirely before the first board goes down.

This guide covers all of it: subfloor preparation, layout planning, laying, tricky cuts and finishing.

Floating, laminate, engineered: what’s the difference?

These three words don’t mean the same thing, and the confusion is common:

The technique described here applies to both products as long as they use a click system.

Choosing your boards

Before you buy, check two things on the packaging:

Buy 10% more than the floor area to cover offcuts and waste. For a heavily cut-up room or a diagonal layout, go to 15%. Buy it all at once and check that the packs share the same batch number: the decor shade can vary slightly between production runs.

Tools and materials you’ll need

Tools

Hammer Hammer Always strike the block, never the board
Tapping block Tapping block Protects the groove while closing joints
Pull bar Pull bar Essential for the last row and along walls
Spacers Spacers 8 to 10 mm — have around twenty ready
Tape measure Tape measure 3 m minimum
Carpenter's pencil Carpenter's pencil Wide, clearly visible line on the decor
Square Square For marking truly perpendicular cuts
Utility knife Utility knife For trimming the underlay
Laminate cutter Laminate cutter Clean cuts with no dust and no noise
Jigsaw For rip cuts and cutting around obstacles
Flush-cut or pull saw For undercutting door casings
Straightedge (2 m) To check how flat the subfloor is

The laminate cutter (guillotine) deserves a special mention. It costs about the same as a day’s hire, cuts a board in one second with no dust and no noise, and lets you work inside the room itself. For straight cross cuts it beats a jigsaw hands down — keep the jigsaw for rip cuts and cutting around obstacles.

Materials

Flooring boards Room area + 10% for waste
Underlay Insulating, with a vapour barrier on concrete
Underlay tape To join the strips together
Skirting or beading To hide the expansion gap
Threshold strips At doorways and changes of floor covering

Step 1: acclimatise the boards

This is the step everyone skips, and the one that causes the most failures. Laminate and wood expand with temperature and humidity. Laid too cold, the boards swell afterwards and the floor cups or lifts.

Use those 48 hours to prepare the subfloor.

Step 2: prepare the subfloor

A floating floor corrects nothing: it reproduces every defect underneath. Each high spot becomes a pressure point where the click joint eventually fails; each hollow becomes a patch that sounds empty underfoot.

Check how flat it is

Run a 2 m straightedge across the floor in every direction. The maximum acceptable deviation is 3 mm under the straightedge. Beyond that:

Check it’s clean and dry

The subfloor must be dry, clean and dust-free. On a concrete slab, do the plastic-sheet test: tape a 50 × 50 cm piece of plastic sheet down airtight and leave it 24 hours. If condensation appears underneath, the slab is still damp — stop there. You’ll need a polythene vapour barrier at minimum, possibly more drying time.

Finally, vacuum thoroughly: a single piece of grit trapped under a board can be heard with every step.

Step 3: roll out the underlay

Underlay rolled out across the whole room, strips laid edge to edge and taped together

The underlay does three jobs: it absorbs micro-irregularities, it provides sound insulation (essential upstairs) and it protects against residual moisture.

  1. Roll the strips perpendicular to the direction of the boards
  2. Lay them edge to edge, never overlapping — an overlap creates a ridge you will feel underfoot
  3. Join the strips with the proper underlay tape
  4. Run the underlay a few centimetres up the walls if it acts as a vapour barrier; you’ll trim it at the end
  5. Cut it as you go rather than covering the whole room at once — you’ll walk on it less

On a concrete slab, add a polythene sheet under the underlay if it doesn’t already include a vapour barrier.

Step 4: choose the direction and plan the layout

Which way to run the boards

Three rules, in order of priority:

  1. In the direction of the natural light, i.e. perpendicular to the wall with the main window. The joints between boards then become almost invisible.
  2. Along the longest dimension of the room: fewer cuts, faster laying, and the room looks larger.
  3. Perpendicular to the existing boards if you’re laying over an old timber floor.

When these rules conflict, light wins in a living space and length wins in a corridor.

Working out the last row

Do this before laying anything. Divide the room width by the width of one board:

Room 320 cm wide, boards 19 cm wide → 320 ÷ 19 = 16.8 rows

That leaves 0.8 × 19 ≈ 15 cm for the last row. Comfortable.

If the remainder falls below 5 cm, don’t lay it that way: a narrow sliver clicks in badly, snaps during installation and is clearly visible. Rip the first row narrower to share the difference between the first and last rows. Two 10 cm rows always beat one full row and one 2 cm strip.

Apply the same reasoning lengthways for the boards at the end of each row.

Step 5: lay the first row

This row determines every row after it. Take your time.

The expansion gap: the one non-negotiable rule

Spacers holding the expansion gap along the wall

A floating floor moves. It swells in summer and shrinks in winter. If it can’t move, it lifts into a dome in the middle of the room — and the only cure at that point is to take the whole thing up.

So leave 8 to 10 mm of clearance all round:

Above all: the floor must not be pinned down anywhere. A skirting board screwed through the boards, a kitchen unit standing on the floor, a sliding wardrobe track screwed into it — any one of these defeats the whole principle.

Beyond 8 metres in one direction, or when moving from one room to another, plan an intermediate expansion joint hidden under a threshold strip.

Step 6: lay the remaining rows

Boards being laid row by row over the underlay

Once the first row is locked in place, progress gets fast: you work row by row across the room, always in the same direction.

Stagger the joints

End joints in adjacent rows must be staggered by at least 30 cm (40 cm on wide boards). A regular offset — always a third of a board, for instance — produces a staircase pattern that catches the eye. Vary the lengths for a natural look.

Good practice: start each row with the offcut from the previous one, provided it’s longer than 30 cm. You waste less and the stagger happens naturally.

Click the boards together properly

Tapping block used at the end of a board to close the joint
  1. Present the board at a 20-30° angle against the row already laid
  2. Drop it flat: the click should happen without forcing
  3. Then engage the short edge with the previous board
  4. If a gap remains, hold the tapping block against the edge and give it a few sharp taps with the hammer

Never hit the board directly with the hammer: you’ll crush the tongue or the groove and it will no longer lock. That’s exactly what the tapping block is for.

Check every three or four rows that everything is still aligned and that the spacers haven’t shifted.

Cutting around obstacles

Step 7: the last row and finishing

The last row

This is where the pull bar becomes indispensable: against the wall there’s no room left to angle the board in or to swing a hammer at a tapping block.

  1. Measure the remaining width at several points along the row — walls are rarely parallel
  2. Transfer those measurements to the board, subtracting the 8 mm gap
  3. Rip it to width with the jigsaw
  4. Present the board, then hook the pull bar over the edge and tap the other end with the hammer to close the joint

Finishing

Wait 24 hours before moving heavy furniture back in, and fit felt pads under chair legs.

The mistakes that cost the most

  1. Skipping acclimatisation — the floor cups or gaps a few weeks later
  2. Ignoring how flat the subfloor is — pressure points, failed click joints, hollow-sounding patches
  3. Forgetting or shrinking the expansion gap — the floor domes and has to come back up
  4. Screwing skirting through the boards — the floor is pinned, same result
  5. Hitting the board directly with the hammer — crushed groove, ruined board
  6. Overlapping the underlay strips — ridges you can feel underfoot
  7. Aligning joints between rows — the floor loses strength and looks terrible
  8. Finishing on a strip under 5 cm — it snaps during laying and shows
  9. Laying standard laminate in a bathroom — unless it’s a specific water-resistant range, the core swells for good
  10. Mixing packs from different batches — a visible shade difference in daylight

Preview your floor before you buy it with Fenchoui

Once the boards are down, the colour decision is irreversible — and a 20 cm sample under shop lighting tells you very little about how it will look across 20 m².

With the Fenchoui app, photograph your room and try different floors directly on your own surfaces: light oak, dark wood, grey tones, different board formats. You see the result immediately in your own lighting, with your walls and your furniture.

It lets you:


Laying a floating floor takes method rather than muscle. A subfloor prepared to the millimetre, acclimatisation respected, and 8 mm of expansion gap everywhere: get those three right and the rest is just patience and careful cuts. Enjoy the job!

See your new floor, before you buy it.

With Fenchoui, try wood species and shades in your own room before ordering the first board.

Discover Fenchoui